Project
|
|
St.
Bonifacius Generating Station
|
|
Client
|
|
|
|
Scope
|
|
Retrofit
of FT-4 Twin Pac. Installation of SSS Clutches. Dismantling
and reassembly of both turbines, including stacks. Retrofit
accomplished within a six-week shutdown period.
|
| |
|
|
|
Project
|
|
John
S. Rainey Generating Station |
|
Client
|
|
Santee
Cooper - Iva, SC |
|
Scope
|
|
Installation
of underground utilities and concrete foundations. Installation
of above-ground mechanical and equipment setting for three
each, GE7EA combustion gas turbine generators and auxiliary
equipment. |
| |
|
|
|
Project
|
|
Arapahoe
Combined Cycle Project |
|
Client
|
|
Black
Hills Energy Capital - Denver, CO |
|
Scope
|
|
Installation
of one each, owner furnished, Dresser Rand Steam Turbine Generator
(50 MW). Installation of two each HRSGs (new) attached to
two LM 6000s. Installation of balance of plant equipment and
electrical. |
| |
|
|
|
Project
|
|
Plant
No. 2 - Engine 14 Installment |
|
Client
|
|
City
of Chanute - Chanute, KS |
|
Scope
|
|
Installation
of one each, owner supplied, Siemens-Westinghouse Model #W251B12
(62 MW) Turbine Generator, including balance plant mechanical
and electrical. |
| |
|
|
|
Project
|
|
Ray
Olinger Power Plant - Phase II Gas Turbine Erection Package |
|
Client
|
|
City
of Garland - Garland, TX |
|
Scope
|
|
Installation
and erection of 76 MW GE Power Systems PG 7121 (EA) combustion
gas turbine generator, including foundations, underground
utilities, equipment setting and alignment, above-ground mechanical
and electrical scope work. |
| |
|
|
|
Project
|
|
Wolf
Hills 2001 Peaker Project |
|
Client
|
|
Constellation
Power Source - Bristol, VA |
|
Scope
|
|
Installation
of five each, owner supplied, FT-8 Twin Pacs (total of 250
MW). Installation of three each, 13.8 kV/138kV transformers.
Design and installation of balance of plant utilities, including
switchyard work, water supply, natural gas, compressed air,
and sewer systems. |
| |
|
|
|
Project
|
|
Sarpy
County Station - Units 4&5 |
|
Client
|
|
Omaha
Public Power District - Omaha, NE |
|
Scope
|
|
Engineering,
procurement and construction of 100MW turbine system. |
| |
|
|
|
Project
|
|
Fuel
Conversion Project |
|
Client
|
|
Muscatine
Power and Water - Muscatine, IA |
|
Scope
|
|
Electrical
& Instrumentation |
| |
|
|
|
Project
|
|
Substation |
|
Client
|
|
Western
Area Power Adminsitration - Huron, SD |
|
Scope
|
|
Civil |
| |
|
|
|
Project
|
|
Turbine
Control Pan Disconnection & Replacement |
|
Client
|
|
Boise
Cascade - International Falls, MN |
|
Scope
|
|
Electrical |
| |
|
|
|
Project
|
|
Hydro
Governor Installation for 7 Units |
|
Client
|
|
Boise
Cascade - International Falls, MN |
|
Scope
|
|
Electrical |
| |
|
|
|
Project
|
|
GE
20 MVA Transformer Project |
|
Client
|
|
Boise
Cascade - International Falls, MN |
|
Scope
|
|
Electrical |