Ongoing maintenance for a paper mill.
Bulk procurement and construction for a 165 MW Simple Cycle Power Plant utilizing (6) LM2500 GE Units
Installation of sitework, foundations, and (3) LM6000’s.
Procure and construct a standalone MCC building, equipment, and tie-in for a future double fermentation tank expansion.
EPC BOP of a 190 MW natural gas fueled peaking power plant utilizing ten (10) Wartsila 18V50SG spark-ignited reciprocating internal combustion engine (RICE) generators with a nominal net output of approximately 19 MW each.
EPC BOP of a 190 MW natural gas fueled peaking power plant utilizing ten (10) Wartsila 18V50SG spark-ignited reciprocating internal combustion engine (RICE) generators with a nominal net output of approximately 19 MW each.
Bulk procurement and construction for a 165 MW Simple Cycle Power Plant utilizing (6) LM2500 GE Units
Procure and construct a new facility on UWGP’s New Energy Campus. The new building will be approximately 12,320 sqft. The building will include two 135,000 lb/hr package boilers, MCC room, storage room, all auxiliaries, condensate, feedwater, blowdown, sampling, water treatment, wastewater, & chemical feed.
BOP EPC for the installation of (5) GE LM6000s in simple cycle configuration.
Maintenance and on going additions to a 3,300 ton per day soy crush facility.
Fagen, Inc. is the EPC contractor for a power project consisting of (2) 50 MW natural gas turbines for a total of 100 MW.