Cross Generating Station

Project Information

  • Santee Cooper, SC

    Fagen, Inc. provided predominantly self perform multi-craft construction services involving the ash handling system of the 600 MW Unit 4 boiler. Following demolition of the entire lower end of this boiler, a new Clyde Bergemann submerged scraper conveyer was installed.

    Activities involving the gypsum handling systems were performed in preparation for the installation of a new water treatment plant. This required removing much of the original gypsum plant, including conveyers and silos.

  • November 2016

  • August 2017

  • Richard Jackson
    Santee Cooper
    Capital Projects Manager
    843.761.8000 ext 4161

  • - Concrete demolition and installation of new slab.
    - Submerged scraper conveyer installation including installation of hoppers, piping, pumps, heat exchangers, blowers, and hydraulics.
    - Removal of twelve large wet ash tanks.
    - Gypsum system control re-wiring and re-powering to a new power distribution building.
    - Steel lime silos removal.
    - New lime silo foundation installation.
Site Index
  • Construction
  • Project Gallery
  • Careers
  • About Us
  • Registration
Corporate Office
Fagen, Inc.
501 W. Hwy 212
Granite Falls, MN 56241

(320) 564-3324
email@fageninc.com

© Fagen, Inc. 2018 - All right reserved.