  • Cargill
    Location. . . Jerome, ID
    Project. . . Cargill B6 Digester
    Scope. . . . . Design-Build contractor for a 2.25 MW Anerobic Digester.

  • Cargill
    Location. . . Roberts, ID
    Project. . . Kettle Butte Digester
    Scope. . . . . Design-Build contractor for a 2.25 MW Anerobic Digester.

  • American Renewables
    Location. . . Gainesville, FL
    Project. . . Gainesville Renewable Energy Center
    Scope. . . . . EPC contractor for a 100 MW Biomass Facility.

  • Novi Energy
    Location. . . South Boston, VA
    Project. . . South Boston Renewable Energy
    Scope. . . . . EPC contractor for a 50 MW biomass power facility.

  • Southern Company
    Location. . . Cushing, TX
    Project. . . Nacogdoches Power LLC
    Scope. . . . . EPC contractor for a 100 MW biomass power facility.

  • Basin Electric
    Location. . . Gillette, WY
    Project. . . Dry Fork Station Unit 1
    Scope. . . . . General Works package for a 425 MW power facility.

  • Black Hills Corporation
    Location. . . Gillette, WY
    Project. . . Wygen III Unit 5
    Scope. . . . . Balance of Plant Piping.

  • City of Fremont
    Location. . . Fremont, NE
    Project. . . Lon. D. Wright Unit 8 AQCS Retrofit
    Scope. . . . . Full EPC wrap AQCS system installation. (Emissions scrubber & baghouse)

  • Black Hills Corporation
    Location. . . Pueblo, CO
    Project. . . Airport Simple Cycle Project
    Scope. . . . . Mechanical contractor for 2 - GE LMS 100’s.

  • Black Hills Corporation
    Location. . . Pueblo, CO
    Project. . . Airport Combined Cycle Project
    Scope. . . . . Mechanical contractor for 4 - GE LM6000 in a 2 x 1 configuration couple with Siemens steam turbines.

  • Black Hills Corporation
    Location. . . Denver, CO
    Project. . . Arapahoe Combined Cycle
    Scope. . . . . Balance of plant equipment and electrical including installation of a 50 MW Dresser Rand steam turbine generator, and two HRSGs atttached to two LM 6000s.

  • Boise Cascade
    Location. . . International Falls, MN
    Project. . . Hydro Governor Installation for 7 Units
    Scope. . . . . Electrical

  • Boise Cascade
    Location. . . International Falls, MN
    Project. . . Turbine Control Pan Disconnection & Replacement
    Scope. . . . . Electrical

  • Boise Cascade
    Location. . . International Falls, MN
    Project. . . Project GE 20 MVA Transformer
    Scope. . . . . Electrical

  • City of Chanute
    Location. . . Chanute, KS
    Project. . . Plant No. 2 Engine 14
    Scope. . . . . Installation of a 62 MW Siemens-Westinghouse Model #W251B12 turbine generator, including balance plant mechanical and electrical.

  • City of Garland
    Location. . . Garland, TX
    Project. . . Ray Olinger Power Plant Phase II Gas Turbine Erection Package
    Scope. . . . . Installation and erection of 76 MW GE Power Systems PG 7121 (EA) combustion gas turbine generator, including foundations, underground utilities, equipment setting and alignment, above-ground mechanical and electrical.

  • City of Garland
    Location. . . Garland, TX
    Project. . . Ray Olinger Power Plant Phase II Gas Turbine Erection Package
    Scope. . . . . Installation and erection of 76 MW GE Power Systems PG 7121 (EA) combustion gas turbine generator, including foundations, underground utilities, equipment setting and alignment, above-ground mechanical and electrical.

  • Constellation Power Source
    Location. . . Bristol, VA
    Project. . . Wolf Hills 2001 Peaker Project
    Scope. . . . . Installation of five FT-8 Twin Pacs and three 13.8 kV/138kV transformers producing 250 MW.Scope of work included balance of plant utilities, including switchyard work, water supply, natural gas, compressed air, and sewer systems.

  • Great River Energy
    Location. . . St. Bonifacius, MN
    Project. . . St. Bonifacius Generating Station
    Scope. . . . . Retrofit of FT-4 Twin Pac including the dismantling and reassembly of both turbines and stacks and installation of SSS clutches.

  • Muscatine Power and Water
    Location. . . Muscatine, IA
    Project. . . Fuel Conversion Project
    Scope. . . . . Electrical & Instrumentation.

  • Omaha Public Power District
    Location. . . Omaha, NE
    Project. . . Sarpy County Station Units 4&5
    Scope. . . . . EPC contractor for a 100MW turbine system.

  • Santee Cooper
    Location. . . Iva, SC
    Project. . . John S. Rainey Generating Station
    Scope. . . . . Installation of underground utilities, concrete foundations, above-ground mechanical and equipment setting for three GE7EA combustion gas turbine generators and auxiliary equipment producing a total of 228 MW.

  • South Texas Electrical Cooperative
    Location. . . Pearsall, TX
    Project. . . Pearsall Power Plant
    Scope. . . . . Fagen, Inc installed underground utilities & foundations for 24 Wartsila 20V34S engines producing 202.5 MW.

  • Western Area Power Distribution
    Location. . . Huron, SD
    Project. . . Substation
    Scope. . . . . Civil

  • Wood Group Power Solutions
    Location. . . Shepherd, TX
    Project. . . East Texas Electrical Cooperative
    Scope. . . . . Civil and electrical package for a 150 MW power facility.

  • Wood Group Power Solutions
    Location. . . El Paso, TX
    Project. . . El Paso Electric Company
    Scope. . . . . Civil and electrical package for a 150 MW power facility.

  • Wood Group Power Solutions
    Location. . . Kountze, TX
    Project. . . Hardin County Peaking Facility
    Scope. . . . . Civil and electrical package for a 150 MW power facility.