Wind Turbines
Aviator Wind
Location. . . Coke County, TX
Scope. . . . . BOP EPC for 525 MW wind farm consisting one hundred thirty-six (136) model GE-116, 2.72 MW Wind Turbine Generators (WTGs), all at 90 meter hub heights, and fifty-five (55) model GE-127, 2.82 MW Wind Turbine Generators (WTGs), all at 89 meter hub heights.Big Blue Wind Farm
Location. . . Blue Earth, MN
Scope. . . . . Installation of 18 2 MW Gamesa wind turbine generators (total of 36 MW) including road installation, foundations, tower and turbine erection, and electrical work.Bloom Wind Power Project
Location. . . Bloom, KS
Scope. . . . . BOP EPC 178.2 MW Wind Farm (54) Vestas V117-3.3 MW on 117m rotors & hub height of 91.5mCampbell County Wind Farm, LLC
Location. . . Pollock, SD
Scope. . . . . BOP EPC for a 95MW wind farm (55 GE 1.7 mw turbines)Cotton Plains Wind Farm & Old Settler Wind Farm
Location. . . Floydada, TX
Scope. . . . . BOP EPC for a 50.4 MW wind farm at Cotton Plains (21 - 2.4 MW GE WTG) and a 151.2 MW wind farm at Old Settler (63 - 2.4 MW GE WTG).Grant County Wind Project
Location. . . Grant County, MN
Scope. . . EPC contractor for 10 - 2.1 MW Suzlon turbines (total of 21 MW)including roads, foundations, erection, collection systems and substations.Idaho Wind Project
Location. . . Burley, ID and Hagerman, ID
Scope. . . EPC contractor for 122 - 1.5 MW Ge wind turbines (total of 183 MW)including roads, foundations, underground collection systems and erectionIsabella Wind Farm
Location. . . Isabella and Midland, MI
Scope. . . Installation of (136) GE 2.82 MW Wind Turbine Generators, as well as the complete engineering, procurement and construction of the balance of plant, including all associated equipment, systems and structures.Latigo Wind Park, LLC
Location. . . Monticello, Utah
Scope. . . BOP EPC for a 62.1 MW wind farm (27 - 2.3 GE Turbines)Minnwind III - IX Wind Projects
Location. . . Beaver Creek, MN
Scope. . . Installation of 7 - 1.65 ME Vestas wind turbines (total of 11.55 MW) including road installation, foundations, tower and turbine erection and electrical work scope complete.Moraine II Wind Project
Location. . . Woodstock, MN
Scope. . . Installation of thiry-three 1.5 MW GE wind turbine generators (total of 50 MW) including road installation, foundations, tower and turbine erection, and electrical work.Outlaw Wind
Location. . . Tarkio, MO
Scope. . . EPC BOP of 51 Vestas V150 4.2 MW and 22 Vestas V120 2.2 MW, for a total of 73 Non-Safe Harbor Turbines and 18 V110 2.0 (8 V110 T2x300 and 10 V110 T2x103) Safe Harbor Turbines for a total capacity of up to 298.6 MW.Palmer's Creek Wind Farm
Location. . . Granite Falls, MN
Scope. . . BOP EPC for 44.6 MW wind farm utilizing (16) GE 2.5MW and (2) GE 2.3MW wind turbines on 90M hub heightsPeak View Wind Energy, LLC
Location. . . Huerfano and Las Animas Counties, Co.
Scope. . . BOP EPC for a 62.1 MW wind farm (27 - 2.3 GE Turbines)Saratoga Wind Project
Location. . . Saratoga, IA
Scope. . . BOP EPC for a 66 MW wind farm utilizing Vestas V116 2.0 MW wtgs.South Peak Wind
Location. . . Judith Basin County, MT
Scope. . . BOP EPC for a 79.4 MW wind farm consisting of 29 GE 2.5 MW WTG and 3 GE 2.3 MW WTG.Suzlon Energy Limited
Location. . . Brewster, MN
Scope. . . Installation and termination of power and control cables for 6 Suzlon S.64/950kW wind turbines. Assisted manufacturer’s rep on turbine commissioning.Valley View Wind
Location. . . Chandler, MN
Scope. . . EPC contractor for 5 - 2.0 MW Gamesa Turbines (total of 10 MW)including roads, foundations, collection systems, and tower erection.Willow Creek Wind Power, LLC
Location. . . Rapid City, SD
Scope. . . Installation of wind powered electric generation facility with a nameplate capacity of approximately one hundred five (103.5) MW, consisting of five (5) GE 2.3-116 and thirty-three (33) GE 2.78-127 wind turbine generators.